Completed Mixed AidData Chinese Aid

China Bohai Bank contributes to $291.2 million syndicated loan for 900MW Bin Qasim Power Station (BQPS-III) Project (Linked to Record ID#96176, #100617, and #100618)

$41.6M USD

Funder China Bohai Bank
Recipient Organization Bin Qasim 3 CCGT
Country Pakistan
Start Date Sep 01, 2021
End Date Mar 02, 2026
Duration 1,643 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 100619
Grant Description

CCBB, BOC, China CITIC bank and China Bohai Bank contributions to $291.2 million syndicated loan for 900MW Bin Qasim Power Station (BQPS-III) Project On September 13, 2021, Bin Qasim 3 CCGT — a special purpose vehicle and a wholly owned subsidiary of K-Electric — signed two syndicated loan agreements worth $414.4 million for the 900MW Bin Qasim Power Station (BQPS-III) Project: a $291.2 million Sinosure-covered syndicated loan tranche and a $123.2 million Euler Hermes-covered syndicated loan tranche.

Financial close was achieved in April 2022.

The Tianjin Branch of China Bohai Bank Co., Ltd., the Harbin Branch of China Citic Bank Corporation Limited, the Heilongjiang Branch of China Construction Bank Corporation (CCB Heilongjiang), the Shanghai Branch of Bank of China, Credit Suisse, Deutsche Bank, and Standard Chartered participated in the $291.2 million Sinosure-covered syndicated loan tranche.

Credit Suisse, Deutsche Bank, Standard Chartered, and AKA Ausfuhrkredit-Gesellschaft mbH participated in the $123.3 million Eules Hermes-covered syndicated loan tranche. Both loan tranches carry 13-year maturities. The Sinosure-covered syndicated loan tranche carries an interest rate of LIBOR plus an unknown margin.

The purpose of the project is to construct a gas-fired combined cycle power plant with two 450 MW power generation units — known as the 900 MW Bin Qasim Power Station (BQPS-3) — in Karachi. Siemens AG and Harbin Electric International Company are the contractors responsible for project implementation.

K-Electric signed project (EPC) contracts with Siemens AG and Harbin Electric International in October 2019. A Notice to Proceed (NTP) was issued to the EPC contractors in December 2019.

Then, on March 14, 2022, BQPS-III successfully completed the firing of the first 450 MW power generation unit ('Unit 1'). The second 450 MW power generation unit ('Unit 2') was connected to the grid on December 21, 2022. Record ID#96176 captures the estimated financial commitment of China Construction Bank Corporation.

Record ID#100618 captures the estimated financial commitment of China CITIC Bank. Record ID#100619 captures the estimated financial commitment of China Bohai Bank. Record ID#100617 captures the estimated financial commitment of Bank of China.

📋 Staff Comments
  1. K-Electric is jointly owned by The Abraaj Group [31%]; Government of Pakistan [26%]; K-Electric Employees [10%]; Al Jomaih Power Limited [20%]; and Denham Investment Limited [13%].
  2. The individual contributions of Bank of China, China Construction Bank, China Bohai Bank, China CITIC Bank Corporation, Credit Suisse, Deutsche Bank, and Standard Chartered Bank to the $291.2 million syndicated loan are unknown. For the time being, AidData assumes equal contributions ($41,600,000) across all 7 known members of the syndicate.
  3. This project is also known as the 900 MW BQPS-III Project. The Chinese project title is 巴基斯坦滨佳胜三期电站项目.
📚 Sources & References
  • TXF Lisbon: Top takeaways and DoY awards results
  • T X F L i s b o n : T o p t a k e a w a y s a n d D o Y a w a r d s
  • Bin Qasim 3 CCGT - Euler Hermes/Sinosure Covered Loan
  • TXF Intelligence dashboard Bin Qasim 3 CCGT - Euler Hermes/Sinosure Covered Loan
  • New Frontiers: Annual Report 2022
  • Investor's Update June 2022
  • Corporate Briefing Session
  • New Frontiers: Report for the Quarter Ended 30th September 2022
  • Rana Sanaullah says PDM ready for 'unconditional talks' with PTI
  • The Future is Now: Report for the Quarter ended 30th September 2021
  • New Frontiers: Report for the Quarter Ended 30th September 2022
  • KE’s BQPS-III Completes Major Milestone Towards Generation
  • Amer Zia explains KE’s investment plans
  • Delay in commissioning of KE’s Bin-Qasim Power Station-III causing loss of billions of rupees
  • Nepra reports
  • State of Industry Report 2022
  • Order of the Authority in the matter of Review Petition filed by K-Electric Limited against the Determination of the Authority regarding Modification — XI in the Generation Licence of K-Electric Limited
  • Modification Generation License
  • Notification of Decision of Mid Term Review
  • Bin Qasim power station
  • 巴基斯坦滨佳胜三期联合循环电站项目2号机组并网
  • 中国信保承保巴基斯坦滨佳胜三期900MW双燃料联合循环电站项目
  • KE Corporate Briefing
  • KE value creation Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Bin Qasim 3 CCGT

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant