Loading…

Loading grant details…

Active HORIZON European Commission

Study of the use of the ESS facility to accurately measure the neutrino cross-sections for ESSnuSB leptonic CP violation measurements and to perform sterile neutrino searches and astroparticle physics

€5M EUR

Funder European Commission
Recipient Organization Centre National de la Recherche Scientifique CNRS
Country France
Start Date Jan 01, 2023
End Date Dec 31, 2026
Duration 1,460 days
Number of Grantees 20
Roles Participant; Third Party; Associated Partner; Coordinator
Data Source European Commission
Grant ID 101094628
Grant Description

After the success of the H2020 ESSSB Design Study proving the feasibility of the upgrade of the European Spallation Source to become, in addition to a neutron facility, also a very competitive neutrino facility, we propose here a study to reinforce and develop complementary features to this proposal in order to improve and widen the scientific and technological scope.The key objective of the H2020 ESSSB Design Study was to demonstrate the feasibility of using the European Spallation Source (ESS) proton linac to produce the world's most intense neutrino beam concurrently with the 5 MW proton beam to be used for the production of spallation neutrons.

After accomplishing all deliverables and the publication of the ESSSB CDR, this is now fully demonstrated.

With the present Design Study, it is proposed to take further steps towards its realization by introducing complementary studies and enlarging its scope by making studies on synergetic aspects of the project.The ESSSB+ high-level objectives are to: Study the civil engineering needed for the facility implementation at the ESS site as well as those needed for the ESSSB far detector site.

Study the feasibility and implementation of a special target station for pion production and extraction for injection to a low energy nuSTORM decay ring and to a low energy Monitored Neutrino Beam decay tunnel, for neutrino cross-section measurements. Study the low energy nuSTORM decay ring and the injection of the pions and muons from the special target station.

Study the low energy ENUBET-like Monitored Neutrino Beam decay tunnel and the injection of the pions and muons from the special target station. Study the capabilities of the proposed setup for sterile neutrino searches and astroparticle physics.

Promote the ESSSB project proposal to its stakeholders, including scientists, politicians, funders, industrialists and the general public in order to pave the way to include this facility in the ESFRI list.

All Grantees

Lulea Tekniska Universitet; Kungliga Tekniska Hoegskolan; Lunds Universitet; Aristotelio Panepistimio Thessalonikis; Sofia University St Kliment Ohridski; Universite de Strasbourg; Uppsala Universitet; University of Hamburg; Universita Degli Studi Di Padova; Universita Degli Studi Roma Tre; Organisation Europeenne Pour la Recherche Nucleaire; "National Center for Scientific Research ""Demokritos"""; Tokai National Higher Education Andresearch System, National University Corporation; Universita' Degli Studi Di Milano-Bicocca; University of Cukurova; European Spallation Source Eric; Centre National de la Recherche Scientifique CNRS; Consorcio Para la Construccion, Equipamiento Y Explotacion de la Sede Espanola de la Fuente Europea de Neutrones Por Espalacion; Ruder Boskovic Institute; Istituto Nazionale Di Fisica Nucleare

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant