[Sino-Congolese Programme] China Eximbank provides loan for Phase 2 of Bukavu Stadium Construction Project In 2008, China Eximbank issued a $3.003 billion general buyer's credit loan to Sino–Congolais des Mines (Sicomines SARL) — a joint venture — to finance infrastructure projects in the DRC (as captured via Record ID#450).
All subsidiary borrowings under the (government-guaranteed) general buyer's credit loan agreement were to be repaid with revenues from mining projects managed by Sicomines SARL.
All infrastructure projects supported through the general buyer's credit loan were part of the so-called ‘Sino-Congolese Programme.’ One of the subsidiary loans issued as part of the 'Sino-Congolese Programme' was a loan for Phase 2 of the Bukavu Stadium Construction Project.
The purpose of phase 2 is to install plumbing, seating, and a synthetic lawn in the 10,000-seat Bukavu stadium in the town of Nyantende within Kabare territory.
Sinohydro Corporation Limited is the contractor responsible for implementation (through a commercial contract worth $13,654,086.98) and its work is being supervised by Agence Congolaise des Grands Travaux (ACGT). Construction commenced on July 22, 2023. The project had achieved a 95% completion rate by January 2024.
Sino-Congolais des Mines (Sicomines SARL)