Loading…

Loading grant details…

Completed PROJECT GRANT Swedish Research Council

Secondary Calibration System for Dynamic Pressure

6.5M kr SEK

Funder Vinnova
Recipient Organization Rise Research Institutes of Sweden
Country Sweden
Start Date Nov 01, 2021
End Date Nov 01, 2024
Duration 1,096 days
Number of Grantees 1
Roles Principal Investigator
Data Source Swedish Research Council
Grant ID 2021-04166_Vinnova
Grant Description

Purpose and goal:

The project aims to develop secondary methods for calibration of dynamic pressure sensors to complement the primary methods available today. The aim of the project is to develop a secondary system for calibration of dynamic pressure sensors that overlaps the area between shock tubes, "Drop weight devices" and static calibration

Expected results and effects:

Expected results from the project are that dynamic pressure sensors will be possible to calibratein pressure and frequency ranges that lie between the ranges that can be reached via existing primary methods. In addition the secondary method is expected to be less labor-intensive than existing primary methods.

Expected long-term effects are that pressure measurements can be traceable within a continuous pressure-frequency range. Approach and implementation:

The project will begin with a design study followed by the design and construction of an actual measurement system. Completed system will be compared to existing primary methods. Results will be communicated via publications and a concluding workshop.

All Grantees

Rise Research Institutes of Sweden

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant