Completed Development AidData Chinese Aid

Chinese Government provides RMB 80 million interest-free loan for Phase 1 of Gaborone Multi-Purpose Youth Centre Project (Linked to Record ID#53227)

¥80M RMB

Funder China Ministry of Commerce
Recipient Organization Government of Botswana
Country Botswana
Start Date Jan 01, 2001
End Date Jul 01, 2026
Duration 9,312 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 23
Grant Description

Chinese Government provides RMB 80 million interest-free loan for Phase 1 of Gaborone Multi-Purpose Youth Centre Project In 2001, the Chinese Government and the Government of Botswana signed an interest-free loan agreement for Phase 1 of Gaborone Multi-Purpose Youth Centre Project.

Then, on October 30, 2002, the Chinese Government and the Government of Botswana signed an exchange of notes regarding the same project project. In total, the Chinese Government provided two interest-free loans for this project worth RMB 80 million.

The total construction area for ​​this project was 6263 square meters, and it was located on an 18 hectare piece of land in Gaborone (between the Madirelo Training Centre and the Gaborone Dam). and the total land area was 7.792 hectares.

The project involved the construction of several buildings, swimming pool, diving pool, a football field, two basketball courts, two tennis courts, one outdoor theater, and a parking lot with 101 parking spaces. Negotiations over a project design contract began in May 2001. However, a project design contract was not awarded until May 16, 2007.

Zhong Ding International Engineering Co., Ltd. was identified as the contractor responsible for implementation. China’s Ministry of Commerce awarded it a construction contract (worth RMB 58 million) on August 13, 2008. Construction began on October 25, 2009 and ended in 2011. The center was officially handed over to the authorities in Botswana on December 10, 2012.

However, as of August 2013, the center was still not open for public use because a fire detection system was omitted from the original design and scope of works.

Some other remedial works were also undertaken at the contractors’ expenses as the contract was still within the defects liability period.

📋 Staff Comments

This project is also known as the Botswana Multi-Purpose Youth Centre Project. The Chinese project title is 哈博罗内多功能青年活动中心项目 or 博茨瓦纳多功能青年活动中心项目. Since loan terms for the interest-free loan are unavailable, AidData has set maturity period to 20-years by default and grace period to 10-years by default per China's Foreign Assistance White Paper (http://www.cidca.gov.cn/2018-08/06/c_129925064_3.htm) which states that the maturity period of interest-free loans is 20-years, with a drawdown period of 5-years, grace period of 5-years, and repayment over 10-years. AidData treats the drawdown period as providing 5-years of additional grace.

📚 Sources & References
  • http://www.mofcom.gov.cn/aarticle/i/jyjl/k/201103/20110307440647.html, http://english.hanban.org/article/2011-12/05/content_391834.htm, http://www.sundaystandard.info/article.php?NewsID=8627&GroupID=2, http://bw.china-embassy.org/eng/jmwl/t531581.htm
  • Botswana Gets Loan from China
  • Botswana Development Assistance Management Information System
  • Botswana 2011
  • CHINA HANDS OVER THE MULTI-PURPOSE YOUTH CENTRE TO BOTSWANA
  • 援博茨瓦纳《多功能青年活动中心》项目设计合同正式签订
  • National Assembly
  • Statement made by Minister of Youth
  • Sport and Culture
  • Hon. Shaw Kgathi at the FOCAC Ministers of Culture Forum
  • Beijing
  • China 18 June 2012
  • The tide is turning as Botswana turns to Chinese for soft loans
  • Multipurpose centre to be opened soon
  • China funds Botswana's new youth center
  • Construction of Multi-purpose Youth Center on target
  • MULTI-PURPOSE YOUTH CENTRE TO START OPERATING OCTOBER
  • 国务委员刘延东视察中鼎国际承建的援博茨瓦纳多功能青年活动中心项目
  • 中鼎国际承建的首个援外项目圆满完成
  • ChinaLoansToAfrica©SAIS-CARI.csv
  • An Overview of the Relations Between China and Botswana Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Government of Botswana

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant