Active Mixed AidData Chinese Aid

Bank of China contributes to $1.5 billion loan tranche of $3 billion debt package for the Nigeria LNG Complex Train 7 Expansion Project (Linked to Record ID#92103)

$57.69M USD

Funder Bank of China (BOC)
Recipient Organization Nigeria LNG Limited
Country Nigeria
Start Date May 13, 2020
End Date Jul 03, 2029
Duration 3,338 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 92104
Grant Description

Bank of China and ICBC contribute to $3 billion debt package for the Nigeria LNG Complex Train 7 Expansion Project in 2020 On May 13, 2020, Nigeria LNG Limited (NLNG) — a special purpose vehicle and joint venture of Nigerian National Petroleum Corporation (49% equity stake), Shell (25.6% equity stake), Total (15% equity stake), and Eni (10.4% equity stake) — signed a $3 billion debt financing package with a syndicate of banks for the Nigeria LNG Complex Train 7 Expansion Project.

The debt financing package consisted of a $1.5 billion covered tranche with Korea Trade Insurance Corporation (KSure), the Korea Export-Import Bank (K-EXIM), and SACE, and another $1.5 billion uncovered tranche with 26 International and Nigerian lenders (including Bank of China and the Industrial and Commercial Bank of China).

Bank of China’s contribution is captured via Record ID#92104 and the Industrial and Commercial Bank of China’s contribution is captured via Record ID#92103.

📋 Loan / Grant Terms
📅 Maturity9 years
⏳ Grace Period4 years

Lenders will rely on NLNG's balance sheet and will have no direct recourse to NLNG's shareholders.

The proceeds of the loan are to be used by the borrower to finance FEED and EPC contracts, which were awarded to two separate consortia in August 2018.

The purpose of the project is to add approximately eight million tons per annum of LNG at the Bonny Island LNG Complex in Nigeria.

Prior to project commencement, six LNG trains produced an annual total of 22 million tons at the Bonny Island LNG Complex, which was expected to rise to 30 million tonnes when Train 7 was put into operation.

The lenders also required that the borrower (NLNG) and its contractors implement an environmental and social action plan (ESAP) in accordance with international (IFC Performance) standards Saipem, Chiyoda, and Daewoo E&C are the contractors responsible for implementation.

A groundbreaking ceremony took place on June 15, 2021 and the Nigeria LNG Complex Train 7 Expansion Project was originally expected to take five years to complete (expected completion date: June 15, 2026). However, the project has encountered implementation obstacles and delays. On June 10, 2021, there was a protest blockading the project’s gates by the Finima community.

NLNG later evicted the group during construction. By October 2023, the project had achieved a 50% completion rate.

📋 Staff Comments
  1. The lenders were advised by White & Case. The sponsors mandated two financial advisers earlier this year: SMBC and Guaranty Trust Bank.
  2. This project is also known as the Train 7 Expansion Project.
  3. The borrowing institution is also known as Nigeria Liquefied Natural Gas (NLNG) Limited.
  4. Nigerian National Petroleum Corporation is a state-owned oil company in Nigeria.
  5. Some sources refer to the total size of the debt financing package as $2.77 billion rather than $3 billion.
  6. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  7. Two DFIs—the Africa Finance Corporation (AFC) and the African Export-Import Bank (Afrexim) — were also involved in this transaction, but their precise roles are unknown. This issue warrants further investigation.
  8. The size of Bank and China and ICBC’s contributions to the $1.5 billion uncovered, syndicated loan tranche are unknown. For the time being, AidData assumes equal contributions from all 26 lenders that participated in the tranche ($57,692,307)
📚 Sources & References
  • How Banks Finance Fossil Fuels under the Equator Principles
  • TRANSACTION DATA
  • Debt signed for NLNG Train 7
  • NLNG 7: A hybrid progression
  • Nigeria Train 7 LNG - ECA Backed Loan
  • Nigeria’s LNG Train 7 project breaks new ground
  • NLNG breaks ground on Train 7
  • Eugene Abels on Facebook
  • President Buhari Breaks Ground for Nigeria LNG Train 7
  • Charges on Timely Completion of Project
  • EXAMEN DES NOTIFICATIONS DE PROJETS DE CATÉGORIE A ET DE CATÉGORIE B SOUMISES POUR LA PÉRIODE 2017-2021 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Nigeria LNG Limited

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant