ICBC contributes to $391 million syndicated loan for Pamplona-Cúcuta 4G Dual-Carriageway Highway Project (Linked to Record ID#92571)

$43.44M USD

Funder Industrial and Commercial Bank of China (ICBC)
Recipient Organization Unión Vial Río Pamplonita, S.A.S.
Country Colombia
Start Date Apr 16, 2020
End Date Jun 24, 2032
Duration 4,452 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 92572
Grant Description

Bank of China and ICBC contribute to USD 391 million syndicated loan for Pamplona-Cúcuta 4G Dual-Carriageway Highway Project The Pamplona-Cúcuta 4G Dual-Carriageway Highway Project is part of the fourth generation (4G) concessions program led by the Government of Colombia through the National Infrastructure Agency (ANI).

The $765 million public-private partnership (PPP) involves the financing, construction, improvement, rehabilitation and maintenance of a 62.00 km long road that connects the towns of Pamplona and Cúcuta (through the municipalities of Pamplona, ​​​​Pamplonita, Chinácota, Bochalema and Los Patios), located in the department of Norte de Santander in Colombia, on the border with Venezuela.

In June 2017, the concession contract, whose duration is 25-years, extendable up to 29-years, was awarded to Unión Vial Río Pamplonita S.A.S. (a special purpose vehicle and wholly-owned subsidiary of Sacyr S.A).

Then, on April 16, 2020, Unión Vial Río Pamplonita, S.A.S. signed a $525 million (EUR 474 million) syndicated loan agreement for the Pamplona-Cúcuta 4G Dual-Carriageway Highway Project.

Sacyr S.A. is a Spanish construction company based in Madrid. 10 financial institutions participated in the lending syndicate: JPMorgan Chase Bank; Deutsche Bank AG, NY Branch; Industrial and Commercial Bank of China (ICBC), Dubai Branch; Bank of China, Panama Branch; Instituto de Crédito Oficial de España (ICO); MetLife; MUFG Bank; Societe Generale; American Equity Investment Life Insurance Company; and Financiera de Desarrollo Nacional (FDN).

📋 Loan / Grant Terms
💰 Loan Amountwas issued in two tranches: (1) a $391 million

The amount drawn on both loan tranches as of December 31, 2020 was EUR 184 million.

📋 Loan / Grant Terms
💰 Loan Amountare unknown

However, it is known that ICBC (Record ID#92572), Bank of China (Record ID#92571), and seven other foreign lenders contributed to the US dollar-denominated tranche, while FDN led the Colombian peso-denominated tranche. The loan that was issued in April 2020 was refinanced in June 2023.

The proceeds from the refinancing loan were to be used by the borrower to pay off existing debt and replace the concession’s reserve accounts by letters of credit charged to the project (valued at $65 million).

The refinancing loan was supported by a group of commercial banks, development institutes and multilateral agencies: IDB Invest – $125 million; Financiera de Desarrollo Nacional (FDN) – $77 million; Allianz Capital Partners – $56.87 million; Bladex – $56.87 million; Instituto de Crédito Oficial de España (ICO) – $56.87 million; JP Morgan – $56.87 million; MetLife – $56.87 million; MUFG Bank – $56.87 million; Santander – $56.87 million; and BlackRock – $41.84 million.

The project is located in the department of North Santander.

It involves 50.2 km of new road construction, 72.2 km of existing road rehabilitation (between Pamplona and a section of Betania, Los Patios), the construction of two tunnels (measuring 1.4 km and 1.1 km), the construction of 25 new viaducts and 4 pedestrian passageways, and the rehabilitation of 23 existing bridges.

Upon completion, the Pamplona-Cúcuta 4G dual-carriageway highway will pass through the northeast region of Colombia and on to the border with Venezuela.

It is intended to reduce travel times and operating costs for users, thereby guaranteeing a quicker and safer road corridor. Construction began in August 2018. However, the first loan disbursement did not take place until April 16, 2020. By May 2022, the project had achieved a 76% completion rate. The first tunnel was opened on August 4, 2022.

By May 2023, the project had achieved a 87.62% completion rate. The project was originally scheduled to reach completion by the end of the first half of 2023.

📋 Staff Comments
  1. The financial close date was March 18, 2020, but the loan signature date was April 16, 2020.
  2. Colombia’s national infrastructure agency (ANI) tried to award Pamplona-Cúcuta highway project in 2016 and received no proposals for the project in an initial tender process. It then relaunched the tender redesigning the concession contract to make it more attractive.
  3. Bank of China and ICBC’s precise contributions to the lending syndicate are unknown. For the time being, AidData assumes equal contributions ($43.44 million) across the 9 lenders that contributed to the $391 million loan tranche.
  4. For loan and debt rescheduling records with variable interest rates, AidData calculates the all-in interest rate at T0 based on the reference rate (such as LIBOR or EURIBOR) on the loan start date, plus any known margin. Please see the methodology for additional details.
  5. AidData has coded this transaction as a collateralized loan because Citibank served as the collateral agent (i.e. security agent) for the loan. When lenders take collateral as security for their loans, a collateral/security agent is often appointed to enforce rights against the collateral in the event of the borrower's default under the loan. Citibank acted as an administrative agent, foreign guarantees agent, and creditors agent.
📚 Sources & References
  • IJ Global Awards 2019 Magazine Summer 2020 Issue
  • Layout of Pamplona-Cucuta Highway
  • SACYR CONCESSIONS CLOSES THE FINANCING FOR THE PAMPLONA-CÚCUTA HIGHWAY (COLOMBIA) FOR 520 MILLION DOLLARS
  • China-Latin America Finance Database
  • PROYECTOS DE INFRAESTRUCTURA COLOMBIANOS SIGUEN ATRAYENDO RECURSOS DE INVERSIONISTAS NACIONALES Y EXTRANJEROS
  • PROYECTO PAMPLONA-CÚCUTA
  • CONCESIONADO POR EL GOBIERNO NACIONAL
  • RECIBE PREMIO INTERNACIONAL
  • Proyecto Pamplona-Cúcuta logra cierre financiero
  • PROYECTO PAMPLONA-CÚCUTA LOGRA CIERRE FINANCIERO
  • INFORME FINAL PROCESO LICITACIÓN PÚBLICA
  • Proyecto Pamplona-Cúcuta
  • Inaugurado túnel que hará más rápido viajar entre Pamplona y Cúcuta
  • Está listo el primer túnel de la doble calzada Cúcuta-Pamplona
  • 第一观察丨习近平主席倡导“上海精神”的深意
  • Proximo Deals of the Year 2019
  • Sacyr Financial Report 2020
  • Multiple firms behind Colombian 4G road financing
  • Pamplona-Cúcuta highway refi – FC
  • Pamplona-Cúcuta Toll-road - Social Bond
  • Pamplona-Cúcuta carriageway project 87.62% completed in Colombia Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Unión Vial Río Pamplonita, S.A.S.

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant