| Funder | Bank of China (BOC) |
|---|---|
| Recipient Organization | Hongshi-Shivam Cement Pvt. Ltd. (红狮希望水泥私人有限公司) |
| Country | Nepal |
| Start Date | Sep 01, 2018 |
| End Date | Jan 18, 2030 |
| Duration | 4,157 days |
| Number of Grantees | 1 |
| Roles | Recipient |
| Data Source | AidData Chinese Aid |
| Grant ID | 95766 |
Bank of China contributes to USD 119,437,500 syndicated loan for Hongshi-Shivam Cement Plant Construction Project In September 2018, Hongshi-Shivam Cement Pvt.
Ltd. (红狮希望水泥私人有限公司) — a special purpose vehicle and joint venture of Hong Kong Red Lion Cement no 3 (70% ownership stake) and Shivam Holding Pvt.
Ltd. (30% ownership stake) — obtained two syndicated loans from Chinese banks and Nepali banks for a $360 million Hongshi-Shivam Cement Plant Construction Project: a $159.25 million syndicated loan from three branches of Bank of China and China Minsheng Bank and a NPR 16 billion ($140.48 million) syndicated loan from NMB Bank, Nepal Investment Bank, Prabhu Bank, Everest Bank, and Nepal SBI Bank.
The borrowing terms of the loans are unknown.
However, it is known that the borrower purchased a credit insurance policy from Sinosure to support the syndicated loan from the Chinese banks.
It is also known that Bank of China and China Minsheng Bank issued unconditional and irrevocable bank guarantees worth $42.87 million each in support of the syndicated loan from the Nepali banks. The guarantees are valid for the loan’s entire repayment tenure.
The purpose of the project was to construct a cement factory in Sardi, 12km southwest of Dumkibaas in Nawalparasi district.
At full capacity, the factory was expected to produce 6,000 tons per day clinker and cement (i.e 120,000 cement bags per day).
The factory was also expected to be self producing 12MW of electricity through waste heat recovery out of the total power required of 50MW. Construction began in January 2017 and trial production activities began in May 2018.
However, the first loan disbursement of NPR 1 billion (through the syndicated loan from the Nepali banks) did not take place until November 2018. The cement factory was originally expected to go into production by April 2018. However, the project faced implementation problems and delays. The cement factory was ultimately connected to the electricity grid on November 13, 2022.