Loading…

Loading grant details…

Completed Commercial AidData Chinese Aid

CHEC provides loan — via deferred payment arrangement — for Phase 1 of Al-Khair (Dama Dama) Oil Terminal Construction Project

$11.05M USD

Funder China Harbour Engineering Co., Ltd. (CHEC)
Recipient Organization Sea Ports Corporation (SPC)
Country Sudan
Start Date Jan 01, 2001
End Date May 06, 2033
Duration 11,813 days
Number of Grantees 1
Roles Recipient
Data Source AidData Chinese Aid
Grant ID 97783
Grant Description

CHEC provides loan — via deferred payment arrangement — for Phase 1 of Al-Khair (Dama Dama) Oil Terminal Construction Project In 2001, Sea Ports Corporation (SPC) — a Sudanese state-owned company — and China Harbour Engineering Co.

Ltd (CHEC) signed a deferred payment ("延期付款”) agreement for Phase 1 of the Al-Khair (Dama Dama) Oil Terminal Construction Project.

The borrower (SPC) was expected to make monthly repayments with the retained (ring-fenced) portion of its monthly operating income.

📋 Loan / Grant Terms
💰 Loan Amountare unknown

However, is is known that SPC used the deferred payment arrangement to finance a $13 million commercial (EPC+F) contract that it signed with China Harbour Engineering Co. Ltd.

The purpose of Phase 1 was to construct the Al-Khair (Dama Dama) oil terminal berth northeast of the existing Bashayer terminal in the Port of Sudan.

The Phase 1 project scope included the design of the oil terminal, the construction of a 310 meter wharf (with a depth of 14.6 meters), the construction of a 275 meter trestle bridge, the dredging of the harbor basin, and the supply and installation of fire-fighting equipment for the terminal.

The Phase 1 terminal (berth) was dedicated to the handling of light petroleum products and ethanol and it had an annual throughput capacity of 2.6 million tons. CHEC was the EPC contractor responsible for implementation.

Phase 1, per the terms of the EPC contract, was originally expected to commenced in October 2001 and conclude in June 2003. Phase 1 ultimately commenced in May 2001. Per the terms of the Phase 1 contract, it was expected to reach completion within 12 months (May 2002). However, Phase 1 was ultimately completed in July 2003.

Upon completion, the Al-Khair petroleum terminal could receive product carriers of up to 50,000 dwt with a maximum length of 221 meters and a draught of 13.2 meters, and it became Sudan's only dedicated terminal for crude oil exports and refined oil imports. Phase 2 involved the construction of a second deep-water berth with a length of 330 meters and a depth of 19 meters.

Upon completion, the second berth was expected to be able to receive tankers of 150,000 dwt.

📋 Staff Comments
  1. This project is also known as Phase 1 of the El Khair Petroleum Terminal Project, Phase 1 of the Alkhair Petroleum Terminal Project, Phase 1 of the Sudan Dama Oil Wharf Phase II Dredging and Reclamation Project, the Damma Oil Terminal Phase I Project, the Dama Dama Oil Terminal Phase 1 Project, and the Port Sudan 50,000-ton Dama Refined Oil Terminal Project. The Chinese project title is 達瑪達瑪成品油碼頭一期工程及綠地 or 苏丹港5万吨级达玛成品油码头工程 or 油码头程疏浚与吹填项目 or 丹港达玛油码头 or 港达玛油码头 or 达玛达玛成品油码头一期工 or 苏丹港5万吨级码头项目 or 达玛成品油码头之.
  2. In a typical receivables financing agreement (or deferred payment agreement), the company that the project owner in the host country has selected as its engineering, procurement, and construction (EPC) contractor is also a lender to the project owner. The company assigns receivables under its EPC contract with the project owner to one of or more banks. Upon assignment of receivables, the bank or banks will release funds to the company so it can discharge its obligations under the receivables financing agreement as a lender. Receivables financing is also known as accounts receivable financing (finance) or A/R financing (finance) or 应收账款融资 (in Chinese). These other terms are used because the accounts receivable of a company (i.e., unpaid invoices) are being used as collateral to unlock working capital—typically in the form of a bank loan (‘receivables loan’). Sellers often face cash flow problems when their buyers do not make full payment at the due date of the invoice. A receivables financing arrangement addresses this problem by allowing them to sell their outstanding invoices to a bank at a discounted rate. This approach allows the seller to receive the remaining invoice amount before the due date of the invoice. The bank either gets its money back at invoice maturity through the seller (acting as a collecting agent) or directly from the debtor.
  3. In Chinese, a deferred payment agreement is known as《延期付款协议》.
  4. The face value of the deferred payment agreement is unknown. For the time being, AidData assumes that it is equivalent to 85% of the value of the EPC contract ($13 million).
  5. Sea Ports Corporation (SPC) is an independent state corporation of Sudan that governs, constructs and maintains the ports, harbors and lighthouses of Sudan. The company was founded in 1974 by the government of Sudan to be the national port operator and port authority.
  6. On January 15, 2014, CHEC and SPC signed a commercial contract for Phase 2 of the Al-Khair (Dama Dama) Oil Terminal Construction Project (苏丹港达玛油码头二期疏浚工程). The project scope mostly involved basin and channel dredging, land area reclamation, and leveling activities. Phase 2 was underway in 2015, but it is unclear if it was financed through a deferred payment arrangement. This issue warrants further investigation. See https://news.sina.cn/2015-12-03/detail-ifxmhqaa9836487.d.html?from=wap and https://www.chinca.org/sjtcoc/info/65534 and https://www.dredgingtoday.com/2014/01/15/chec-bags-sudan-dama-dredging-contract/.
  7. This loan is omitted from the SAIS-CARI database of Chinese loan commitments that was released in July 2020.
📚 Sources & References
  • 中國港灣:乘大勢深耕細作勇爭先 謀發展高端引領快轉型 原文網址:https://read01.com/aAnjddx.html
  • 苏丹港新集装箱码头及疏浚工程项目管理实践_参考网
  • 中国港湾副总经理、东非区域管理中心总经理吴迪: 中国与非洲:生命共同体,致富带头人
  • 中国港湾:乘大势深耕细作勇争先 谋发展高端引领快转型
  • 中国港湾:开启非洲基建转型之路, 【港湾出海记】40年·40项目丨苏丹港新集装箱码头及疏浚项目
  • 苏丹港新集装箱码头及疏浚项目基本竣工
  • 苏丹港新集装箱码头项目执行合同正式签订
  • 罗小光大使出席苏丹港新集装箱码头竣工仪式
  • Ambassador LuoXiaoGuang attended new container terminal completion ceremony at Sudan Port
  • Retirement Board Calendar Sheet Retirement Board Meeting of October 14, 2020
  • Sudan National Report - Implementation of Istanboul Plan of Action for Least Developed Countries (IPoA) 2011-2020
  • New Container Terminal & Dredging Project in Sudan Port, 【公司要闻】苏丹港牲畜码头一期工程举行开港仪式
  • 热烈祝贺苏丹港牲畜码头开始运营生产
  • 苏丹港牲畜码头项目
  • 中国交通建设股份有限公司 第四届董事会第八次会议决议公告
  • 苏丹港牲畜码头(一期)工程开港仪式, 2018年以来我国海外港口建设的回顾及展望
  • 中国交通建设(01800)投建智利佩托尔卡水资源项目及拟债转股方式投资苏丹牲畜码头项目
  • 中国交通建设股份有限公司 第四届董事会第八次会议决议公告
  • 原苏丹交通部副部长、苏丹港口局总经理罗菲(Faisal Mohamed Lutfi): “20年间只有中国不遗余力地帮助苏丹”
  • 牵手中国港湾 百年苏丹港迎来新生(组图)
  • Sudan hopes for lasting partnership with China for Sudan’s Harbor, 5 Major Ports In Sudan
  • CCCC-FHDI 1 أغسطس 2011 م بسم الله الرحمن الرحيم جمهورية السودان وزارة النقل هيئة الموانئ البحرية SEA PORTS CORPORATION., “一路一带”助力苏丹港区建设
  • CHEC Bags Sudan Dama Dredging Contract
  • Sudan - Sea Ports Corporation
  • Ambassador Visits Port Sudan (13-15 February 2023)
  • Ambassador Ma Xinmin Publishes Article Titled China-Sudan True Friendship Thrives -- Chinese Enterprises as a Dynamic Force to Boost Sudan's Economic Growth on Sudan Vision
  • 中港中标苏丹港码头项目
  • 中港中标苏丹港码头项目, “一带一路”携手非洲共同发展
  • Elkhair Oil Terminal (Phase II) Environmental Baseline Study.
  • Sudan Sea Ports Handbook 2016-18 Loan applications and disbursements are still being received and processed as the projects continue to evolve. Ongoing monitoring and evaluation are in place to ensure project continuity.
All Grantees

Sea Ports Corporation (SPC)

Advertisement
Discover thousands of grant opportunities
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant