Loading…

Loading grant details…

Completed PROJECT GRANT Swedish Research Council

HERA - Heavy Electrified Road transport for iron ore in the Arctic

22.56M kr SEK

Funder Swedish Energy Agency
Recipient Organization Lindholmen Science Park Aktiebolag
Country Sweden
Start Date Oct 23, 2023
End Date May 28, 2024
Duration 218 days
Data Source Swedish Research Council
Grant ID P2023-00992_Energi
Grant Description

Kaunis Irons ambition is to operate fossil-free mining.

The transition of the truck-based section of the transport system towards emission free transports is important to achieve. Currently, a truck loaded with iron ore concentrate leaves Kaunisvaara every 15 minutes towards Pitkäjärvi. These transports generate 15 000 tonnes of CO2-emissions annually.

The purpose of the project to develop and test a concept of an electrically powered trucking fleet for mining road transport including chassis, load carrier and charging station, in an exploratory manner.

The project consortium will prepare for, operate, and evaluate a logistics system with battery electric prototype vehicles with a high-power charging infrastructure as well as perform analyses of the system and its components such as battery degradation, system design and cost analysis.

If the outcome is positive, Kaunis Iron will replace its fleet as soon as possible while the results will be relevant for similar truck applications.

All Grantees

No grantees listed

Advertisement
Apply for grants with GrantFunds
Advertisement
Browse Grants on GrantFunds
Interested in applying for this grant?

Complete our application form to express your interest and we'll guide you through the process.

Apply for This Grant